Listing# 1144227

Wanted: Canning Line, 60 or 90k cph


Key items: filler, seamer, multi-packer. Plus depal, inspection, pasteurizer and more. An EquipNet client is building a new brewery (Brewery Project 2026). Items wanted: Can depalletizer; Empty can inspection; Filler + FHI; Seamer + SI; Pasteurizer; Dryer; Labeller + LBI; Coding; Multi-packer; Secondary-pack palletizer.

I Have It!

All Fields Are Required