Canada
$475,000.00 USD
Our client had a site that needed to fully close down located in Joplin, MO. The company wanted to have the entire facility cleared out by the end of 2013, so EquipNet only had a 6 month timeframe to achieve total clearance on 180 assets, many of which were heavily installed.
EquipNet, Inc.
5 Dan Road
Canton, MA 02021
[email protected]
+1-781-821-3482
View All Locations
© EquipNet, Inc. 2024 - All rights reserved.